In healthcare planning, design, and construction, document coordination is where projects quietly succeed or quietly fail. This article is for healthcare owners, owner’s representatives, architects, engineers, and construction managers working through the design phase of a complex capital project. The take-away: clarify roles across the four key stakeholders during design and treat document coordination as a creative, team-owned process, not a back-office task.
In healthcare planning, design, and construction, project team members should always be mindful of the project’s intended impact rather than just the technical aspects of project delivery. The project aligns with a specific strategic and functional purpose, such as improving patient care, enhancing the well-being of healthcare staff, or optimizing operational efficiency. The project's design phase is the critical time when the team translates these objectives into the building's physical design. While the architectural team carries much of the responsibility during the design phase, many of the most successful project’s stem from collaborative, interdisciplinary teams where project members know when and how to contribute.
So let’s consider the key stakeholders involved during the design phase of the project—the owner, the owner’s representative, the architectural team, and the construction facilitator—and how their roles and expectations can contribute to the design phase and overall project success:
Architecture & Engineering (AE) Team: The AE team has the toughest assignment during the design process. They must assimilate all information directed towards them, including verbal directions, and put them to paper. The AE team must ensure all their team members are hearing the same things and getting all design criteria coordinated on the working documents. Again, changes are inevitable, but collaborating with the entire team reduces the potential for scope gaps and mistakes. The AE team is tasked with creating the documents—the final product—that is presented to the owner and used by the entire team. The architect should be completely transparent with the team if they are delayed. If more time is needed to complete a specific deliverable, whether due to a delay in decision making, AHJ approvals, a project delay brought on by unforeseen circumstances, or an internal workforce delay, open communication will help inform the team and determine how best to work around it. It is better to have complete documents rather than risk delays in the project budget and schedule due to a lack of coordination and thoroughness for all parties to respond to.
The design and engineering documents produced during the design phase are critical to establishing a solid foundation for the project. These documents ensure that the project team stays aligned, safeguarding the project's impact, budget, and timeline. Design documents clearly define the requirements, bringing the conceptual design to reality by detailing the civil, architectural, structural, mechanical, electrical, IT and plumbing solutions. Once the owner approves the design development package, changes to the drawings should be limited to comply with construction or code requirements to minimize cost impact.
Coordinating design documents presents an opportunity to innovate by leveraging the principles of creative problem-solving across the entire project team—the owner and/or owner’s representative, architects, engineers, and construction professionals. Project team members should be wary of working in silos rather than tapping into the collective experience, expertise, and perspectives of the broader project team. All team members should have a sense of ownership of and responsibility for the design documents, just as they should the project’s overarching vision and mission. Team members should proactively ask the right questions at the right time to ensure the documents are complete and sufficiently detailed. Taking these steps can help avoid problems down the road and reduce the tendency to point fingers, or worse, delay the project.
A collaborative approach to document coordination during the design phase could involve the following elements:
By synthesizing these diverse elements, the coordination of healthcare design and engineering documents can evolve from a purely technical endeavor to a creative, purpose-driven process that aims to maximize the potential impact of the healthcare facility on patients, staff, and the broader community.
The deliverables list in the attached appendix can help ensure expectations are aligned around the level of detail required for each set of document drawings and, ultimately, a better outcome with coordinated documentation.
Wade Milligan is a Regional Vice President with Hammes Healthcare. He has more than 30 years of experience in healthcare facility development, including large-scale hospital expansion and renovation projects. His experience as a business owner, general contractor, and owner’s representative brings unique strengths in developing optimal design and construction solutions for healthcare development projects.